New Project Assignment by MOTOR OIL Group: VERD Facility x SENERQON
- SENERQON

- 6 days ago
- 2 min read
SENERQON is proud to announce a new project assignment by the MOTOR OIL Group, following a structured evaluation and competitive tendering process conducted at Group level.
As part of MOTOR OIL’s ongoing strategy to continuously enhance energy efficiency, electrical performance, and operational reliability across its industrial assets, SENERQON has been selected to undertake an Electricity Savings & Electrical Installation Performance Optimization Project at the VERD facility.
Group-Level Evaluation and Assignment
The technical evaluation, assessment, and final project assignment were carried out centrally by the MOTOR OIL Group.This centralized approach ensures that high-standard engineering solutions are consistently implemented not only at the Group level but also across subsidiary production facilities.
SENERQON’s selection reflects the Group’s confidence in our scientific methodology, AI-driven modelling, and proven track record in delivering measurable results in demanding industrial environments.
A Fully Turnkey Engineering Project
The project will be delivered as a fully turnkey solution, covering the entire engineering and implementation lifecycle.
The scope of work includes:
Detailed on-site electrical measurements and system analysis
Scientific modelling using advanced AI algorithms and simulation techniques
Design and construction of customized engineering interventions
Full installation and commissioning of the systems
Targeted improvements in energy efficiency, power quality, and electrical reliability
In addition, the project will provide protection against voltage sags and electrical disturbances, enhancing the resilience and long-term stability of the electrical installation.
Engineering Objectives and Expected Impact
Through this project, SENERQON aims to deliver:
Improved energy efficiency and reduced electrical losses
Enhanced power quality and voltage stability
Increased system reliability and operational continuity
Effective protection of critical electrical equipment against voltage sags
A technically robust and financially sound solution
All interventions will be designed based on real measurement data and scientific modelling, ensuring accuracy, reliability, and verifiable performance.
Strengthening a Trusted Partnership
This collaboration with the MOTOR OIL Group, for the VERD factory, marks an important milestone for SENERQON and further strengthens our role as a trusted engineering partner for large industrial groups.
More updates will follow as the project progresses through implementation and commissioning phases.
SENERQON — Turning Engineering into Verified Performance
For more information about our methodology and projects, visit:👉 https://www.senerqon.com/projects






Comments