New Project Assignment: Doriki Dairy x SENERQON
- Feb 12
- 1 min read
SENERQON Group is pleased to announce the award of a new Electricity Savings & Electrical Installation Performance Optimization Project at Doriki Dairy.
Doriki Dairy operates energy-intensive dairy production facilities, where electrical efficiency, reliability, and system performance are critical to uninterrupted production and long-term operational sustainability.
Project Objectives
The project aims to optimize the overall performance of the electrical installation, with a focus on:
Reducing electrical energy consumption
Improving electrical installation efficiency
Enhancing power quality and voltage stability
Supporting reliable and efficient industrial operation
Scientific & Engineering Approach
The project will begin with detailed on-site electrical measurements. These measurements will form the basis for scientific analysis, advanced simulations, and AI-supported modelling, enabling SENERQON’s engineers to design customized, data-driven interventions tailored to the specific operational characteristics of the facility.
Each stage of the project will be developed with a strong emphasis on technical robustness, measurable performance, and long-term value creation.
Looking Ahead
This new collaboration further strengthens SENERQON’s presence in the industrial dairy sector and reinforces its role as a trusted engineering partner for energy-intensive facilities.
We thank Doriki Dairy for the trust placed in SENERQON and look forward to delivering scientifically validated and verifiable results throughout this project.
SENERQON | Turning Engineering into Verified Performance





Comments