top of page

New Project Assignment: KAPACHIM x SENERQON

  • Feb 18
  • 1 min read

SENERQON Group is pleased to announce that it has been awarded a new Electricity Savings & Electrical Installation Performance Optimization Project at KAPACHIM’s factory in Oinofita.


KAPACHIM is a leading chemical manufacturing company, with international activity and presence in multiple countries, operating technologically advanced and energy-intensive production facilities. Electrical reliability, power quality, and efficiency are critical parameters for such industrial environments, making this project a strategic step toward long-term operational optimization.


🔍 Project OverviewThe project will focus on:

  • Reducing electrical energy consumption

  • Optimizing the performance of the electrical installation

  • Improving power quality and system stability

  • Supporting reliable, efficient, and uninterrupted industrial operation


The project will begin with detailed on-site electrical measurements, forming the foundation for scientific analysis, advanced modelling, and the design of customized engineering interventions.


We thank KAPACHIM for the trust placed in SENERQON and look forward to delivering scientifically validated, measurable results for this important industrial facility.


SENERQON | Turning Engineering into Verified Performance



 
 
 

Comments


Commenting on this post isn't available anymore. Contact the site owner for more info.
bottom of page