top of page
Diaxon NEW PROJ.2020
image-202_edited.jpg

Savings Achieved

8,44%

Payback Period

2.24

About the project

"The weighted average energy saving result was found to be equal to 8.44%, greater than the guaranteed result of 7.8%, based on the project contract... (translated from Greek)

-Nikolaos Papalazarou, Head of Maintenance Department

bottom of page