This project took place at the Etihad Mills facility at the port of Fujairah, UAE. A total of 25 interventions were installed in parallel to the grain cooling units as well as the crane loads at the port. All the equipment were made to withstand the extreme summer temperatures in the outdoors using heat exchanger units. The overall electricity savings achieved were verified to 13.4%, with some months showing significantly higher savings numbers.