Hellenic Petroleum Group Kalochori

About the project
This project completed the energy savings and power quality project at Hellenic Petroleum in April 2011. Power Quality interventions were installed in both medium and low voltage to reduce significant current and voltage harmonics up to 80%, optimize the voltage and current quality, maximize the efficiency ratio and increase the reserve and capacity charge within the grid. A savings of 840.000EUR or 9.8% was achieved. “The final percentage of electricity savings achieved in the unit’s electrical installation is 9.8%. This percentage far exceeds the 6.8% that was the minimum agreed upon in the Project Contract’
-A. Katsanikos, Director of North Industrial Facilities Group